An emergency action plan (EAP) is the procedure your people follow when a fire or other emergency hits: how to report it, how to get out, and how everyone gets counted. Under 29 CFR 1910.38(c), the plan must include at least six elements, which are in the table below.
Almost nobody reads their emergency action plan until the day it matters or the day someone asks for it. An OSHA compliance officer asks where it’s kept. An insurance carrier’s loss-control visit puts it on the checklist. A general contractor’s prequalification packet wants it attached. Or a near-miss makes leadership pull the binder and discover the evacuation map shows a wall that came down years ago. If the plan landed on a facilities manager by default, our guide to facilities management health and safety responsibilities covers what else came with it.
3P Safety Consulting builds the plan as an advisory and documentation service: we collect the floor plans, headcounts, alarm details, and hazard profile; draft the written plan, evacuation maps, and role assignments; review every line with you; and deliver a final document with a drill schedule and a training-needs note. Not shelf filler — a plan your people could execute with the lights out.
When OSHA Requires an Emergency Action Plan
Section 1910.38 is a referral standard: paragraph (a) requires an emergency action plan whenever another OSHA standard in Part 1910 requires one. Plenty do. The portable fire extinguisher standard (1910.157) reaches most employers through its election rules. Total-flooding fire suppression systems (1910.160), process safety management (1910.119), the evacuate-only option under HAZWOPER (1910.120), grain handling (1910.272), and substance-specific standards such as ethylene oxide (1910.1047) all point back to 1910.38.
The extinguisher standard is what makes the requirement near-universal in practice. Nearly every workplace keeps portable extinguishers, usually because the local fire code demands them. Under 1910.157, an employer can train every employee annually to fight incipient-stage fires — or designate a limited group to use extinguishers while everyone else evacuates, or prohibit firefighting entirely under a total-evacuation policy. Every election except train-everyone runs through an emergency action plan meeting 1910.38, and the total-evacuation route requires a fire prevention plan under 1910.39 alongside it.
Written Plan or Oral Plan — Where 1910.38(b) Draws the Line
Paragraph (b) sets the format: the plan must be in writing, kept in the workplace, and available to employees for review. One exception — an employer with ten or fewer employees may communicate the plan orally. That puts the written obligation, as a practical matter, at eleven employees and up.
We recommend a written plan even below the line. An oral plan can’t be attached to a prequalification packet, handed to a compliance officer, or relied on through turnover — and the discipline of writing it down is what surfaces the gaps. “Available for review” matters too — employees have to be able to actually reach it.
The Six Minimum Elements of an OSHA Emergency Action Plan Under 1910.38(c) — and Where Plans Fail
Paragraph (c) lists the minimum content. Every element sounds obvious until you read real plans against it:
| Element | What It Must Say | Where Plans Fail |
|---|---|---|
| Emergency reporting procedures | How employees report a fire or other emergency — alarm pulls, internal numbers, 911 protocol, and who is called in what order | “Notify your supervisor,” with no numbers, no after-hours path, no answer for a lone night operator |
| Evacuation policy, routes, and exit maps | The type of evacuation required, exit route assignments by work area, and posted maps that match the current floor plan | Maps drawn before the last renovation; every department funneling to the same door because nobody assigned routes |
| Procedures for employees who remain | Who stays briefly to shut down critical plant operations, the shutdown steps, and the point at which they stop and evacuate | “Designated employees” the plan never designates; shutdown steps living in one veteran’s head |
| Accounting for all employees after evacuation | Muster locations plus a counting method — rosters, headcount owners, sweep assignments — and who reports gaps to responders | A named muster point with no method behind it; visitors and contractors invisible to the count |
| Rescue and medical duties | Which employees perform rescue or medical duties and the procedures they follow | Duties assigned to a first-aid team that dissolved two turnover cycles ago |
| Contact information and the alarm system | The name or job title to contact about the plan, and an alarm with a distinctive signal for each purpose per 1910.165 | A contact who left the company; one horn meaning both evacuate and shelter-in-place |
The alarm row deserves emphasis. Paragraph (d) requires an employee alarm system complying with 1910.165, and “distinctive signal for each purpose” is the phrase that trips facilities: if evacuation and severe-weather shelter sound identical, half the workforce heads for the doors while the other half heads for the refuge area.
Scenario Coverage Worth Writing Past the Federal Floor
1910.38(c) is a minimum, and fire is its anchor scenario. A plan that stops there is silent on emergencies your people may be more likely to meet. We routinely write — as prudent additions, not OSHA mandates — severe-weather and tornado procedures, where the correct movement is shelter-in-place rather than evacuation and refuge areas must be chosen deliberately; medical-emergency response, tied to the plan’s rescue-and-medical assignments; and active-threat lockdown procedures, which reverse almost every evacuation instinct the rest of the plan builds.
When anything goes wrong, the emergency action plan is where employees and front-line supervisors will look. A document that answers only the fire question teaches people to stop consulting it.
Second Shift, Visitors, and Contractors — the Accounting Gap
Emergency plans get written by day-shift people about day-shift conditions. Then the fire happens at 2 a.m., when eleven people are running the building instead of eighty, the trained floor warden is asleep at home, and the muster roster reflects a shift that ended nine hours earlier. A plan that never mentions the night crew hasn’t planned for a third of the operating year.
Visitors and contractors are the other accounting hole. A sign-in sheet only helps if a named person grabs it on the way out, and a contractor crew’s own safety plan doesn’t tell them where your muster point is. We write per-shift role assignments, a visitor accounting method, and contractor coordination language into every plan where they apply.
The Fire Prevention Plan: 1910.39 as the Natural Companion
The emergency action plan says what people do once something goes wrong; the fire prevention plan under 1910.39 works the other side — keeping the fire from starting. Its required elements: a list of major fire hazards with handling and storage procedures, potential ignition sources and their controls, and the fire protection equipment matched to each hazard; housekeeping procedures controlling accumulations of flammable and combustible waste; maintenance procedures for safeguards on heat-producing equipment; and the names or job titles of those responsible for equipment maintenance and for fuel-source hazards.
The same ten-or-fewer oral exception applies, and the total-evacuation extinguisher election requires both documents. The intake for one is ninety percent of the intake for the other, so we build them together by default — two coordinated documents from one review cycle.
Drills — What the Rules Ask and What Reality Demands
Honest framing first: 1910.38 does not require evacuation drills, and for most general industry employers no federal OSHA standard does. Specific operations under other standards, many local fire codes, and some insurance carriers impose their own drill requirements — where those apply we say so. We won’t call a drill a federal mandate when it isn’t.
Field experience says otherwise: the plan that has never been drilled fails the first time it’s used. The first drill is where assumptions crack — the exit blocked by staged pallets, the muster point sitting in the fire lane, the headcount that takes twenty minutes because no method existed. Every plan we deliver includes a recommended drill design and schedule plus a simple after-action note template, so each drill becomes documented improvement. Distribution buildings add their own list — docks, racking, forklift traffic — and our guide to warehouse health and safety walks it in the order a consultant would.
How the Build Runs, Intake to Final Plan
It starts with a structured site intake: current floor plans, headcount by shift, the alarm system and its signals, exits and their condition, the hazard profile, and any standards already pulling you into 1910.38. From that we draft — the written plan, evacuation maps by area, and role assignments by name or job title: reporting, critical-operations shutdown, floor sweeps, muster counting, rescue and medical duties, and the plan contact under (c)(6).
Then a review pass with you — every assignment checked against real people and real shifts, every route checked against the actual building — and final delivery: the plan, maps ready for posting, a drill schedule recommendation, and a training-needs note flagging the duties the standard attaches to people, so nothing lands on someone who’s never been told. Most single-facility builds finalize within a couple of weeks of a complete intake.
Failure Patterns That Sink Real-World Plans
The same handful of defects shows up in most plans we’re asked to review or replace:
- Maps two renovations old — the posted evacuation route walks employees through a wall, a new mezzanine, or a door that’s now a storage rack
- A muster point with no method — everyone knows where to stand and nobody knows who counts, against what roster, or who tells the fire department someone’s missing
- A day-shift-only document — the night crew appears nowhere: no warden, no counter, no shutdown owner after 5 p.m.
- Unnamed responders — rescue and medical duties assigned to a team or title that no longer exists, so the duty survives and the person doesn’t
- A ghost contact — the (c)(6) name left the company years ago, and nobody currently on payroll can explain the plan
None of these takes budget to fix — it takes someone sitting down with the current facts and rewriting the document against them. That’s the service.
Where This Engagement Ends — and What Connects Next
This is advisory and documentation work — professional safety guidance, not legal advice, and not classroom delivery. The standard itself puts duties on people: 1910.38(e) requires designating and training employees to assist in a safe and orderly evacuation, and (f) requires reviewing the plan with each covered employee when it’s developed, when they’re first assigned, when their responsibilities change, and when the plan changes.
Our training-needs note maps those obligations to your roster; delivery runs through our training-side sister company, whose fire prevention and emergency action plan training is built to teach exactly the documents we write. First aid and CPR courses — relevant wherever the plan assigns medical duties — run through that same training company.
Two neighbors on this site: if you suspect the EAP is one of several missing or stale documents, an OSHA compliance audit finds the whole list before you fix things one at a time. And if the answer is most of the binder, our written safety program development bundles this plan with the rest of the library in one engagement.
Why 3P Safety Consulting Builds Emergency Plans
Founder Patrick Salazar is an OSHA 500 authorized construction outreach trainer and a working NCCCO-certified mobile and tower crane operator, certified crane inspector, and lift director — in the field since 2005. The 3P Safety family has served more than 1,000 companies across training, inspection, and advisory work, from its base in Goldsboro, North Carolina. Plans here are written by people who work in the buildings they protect — not from a template that has never met a facility.
Pricing an EAP Engagement
Three drivers: facility count and size (one building or a campus, square footage, and how current the drawings are), shift structure (each operating shift needs its own accounting and role coverage), and scenario scope (the 1910.38 core, the 1910.39 companion, and any added scenarios like severe weather or lockdown). Describe the operation through our contact page or call (252) 274-0583 — the quote comes back as one number, typically the same business day.
Frequently Asked Questions
We have ten or fewer employees — do we need anything in writing?
1910.38(b) lets an employer with ten or fewer employees communicate the plan orally instead of in writing. Legal, yes; wise, rarely. An oral plan can’t be produced for an inspector, attached to a prequalification packet, or relied on through turnover. At that size the document is short — most employers write it down anyway.
Does OSHA require fire drills?
For most general industry employers, no — 1910.38 requires a plan, training for designated evacuation assistants, and plan review with employees, but not drills. Certain operations under other standards, many local fire codes, and some insurance carriers do require them. We treat drills as essential practice rather than a federal mandate, and we tell you which applies to you.
What’s the difference between an emergency action plan and a fire prevention plan?
Direction of effort. The EAP (1910.38) governs response — reporting, evacuating, accounting, rescue and medical duties — once an emergency exists. The fire prevention plan (1910.39) governs prevention — fire hazard inventories, ignition-source control, housekeeping of combustible waste, and maintenance of heat-producing equipment safeguards. Separate documents, separate minimum elements, usually required together and best built together.
Can one plan cover multiple buildings or sites?
The policy core can be shared, but 1910.38’s elements are workplace-specific by nature — exit route assignments, maps, muster points, and role assignments only mean something for a particular building and crew. We structure multi-site plans as a common core plus a site annex per facility, so each location holds a plan an inspector can read against that address.
What does an OSHA inspector actually check on an EAP?
In our field experience: that a written plan exists and is genuinely available to employees, that all six (c) elements are present and specific to the facility, that the alarm system uses distinctive signals per 1910.165, and — through employee interviews — that people can say what they’d do and where they’d go. A binder nobody recognizes fails the interview even when the paper is perfect.
How does shelter-in-place fit into an evacuation plan?
As its own procedure with its own signal. Severe weather moves people to interior refuge areas — the opposite direction from a fire evacuation — so the plan must select refuge locations, define a distinct alarm, and state which events trigger which movement. OSHA doesn’t mandate a tornado procedure in 1910.38, but a plan silent on the region’s most likely emergency isn’t finished.
When does the plan have to be reviewed with employees?
Paragraph (f) sets three triggers: when the plan is developed or an employee is first assigned, when the employee’s responsibilities under the plan change, and when the plan itself changes. Beyond the rule, we recommend a fresh look after any renovation, alarm change, or shift restructure, and annually on the calendar — recommendation, not regulation, and labeled that way.
Do you deliver the employee training too?
No — this engagement produces the plan, the maps, the drill design, and the training-needs note that tells you exactly who needs what. Training delivery is deliberately separated into the 3P family’s training company, so the advisory work stays independent of what it recommends. You can route it to any qualified provider you choose.

